Service Details
Date & Time
Payment
Post-Construction Cleaning

Rough
Post-Construction CleanWhen to Schedule: Before Carpet installation and after water & power are on, and the interior has been painted. We like to combine the non ladder windows with the Rough (we will get the ladder windows after the sod is installed) We clean the glass, tracks, and frames inside and out. With the Rough Clean, we clean the bathrooms and the kitchen. If the rough isn’t ready or doesn’t have water we can clean without water just please notify us so we can bring buckets. We will sweep the house on the Rough clean all the cabinets inside and out and clean on top of all protective covering to allow the dust to settle on it for the Final Clean.

$0.00
AddWindow
Post-Construction CleanWhen to Schedule: Before Carpet installation and after water & power are on, and the interior has been painted, along with the Rough. We clean the glass, tracks, and frames inside and out.

$0.00
AddFinal
Post-Construction CleanWhen to Schedule: House is completed This involves removing all protective coverings and thoroughly cleaning the entire house, preparing it for inspection. While we can combine the Rough and Final cleaning if your schedule is tight, we strongly advise against it. Doing so tends to stir up a significant amount of dust, which can prolong subsequent cleaning sessions. Such houses typically require additional cleaning visits to ensure the satisfaction of the new homeowner.

$0.00
AddReclean
Post-Construction CleanWhen to Schedule: Following punch-out After the punch-out is completed to address inspection and customer concerns, we clean the house again just like the final clean.

$0.00
AddHomeowner Touch up #2
Post-Construction CleanWhen to Schedule: Before Closing If schedules are tight it's hard for builders to schedule 5 cleans but if they do they will have a very satisfied customer. The goal is to make accounting easy and happy homeowners.

$0.00
AddHomeowner Touch up #1
Post-Construction CleanWhen to Schedule: Before Closing We remove the last 25% of settled construction dust and clean the whole house just like final clean.

$0.00
AddPressure wash
Post-Construction CleanWhen to schedule: Ready as soon as the sod is installed, and we have access to water. This is often combined with the Final clean but is ready after the sod is installed to prevent mud going into the street. We soft wash all of the flatwork including the garages, front and back porches, side walk, and around the lower portion of the house from where the dirt got onto the exterior of the house. We have 4 gallon per minute pressure washers, the volume of the water is more important than the pressure. This is also combined with the high windows that require a ladder.

$0.00
AddAdd to Weekly Spec Rotation
Post-Construction CleanWhen To schedule: After construction project is completed but before Homeowner touch-up clean #2. A routine cleaning schedule that occurs on a weekly basis after a construction project is completed, focusing on maintaining a clean space by removing dust, debris, and any remaining dirt that might accumulate throughout the week, usually including tasks like sweeping floors, wiping down surfaces, and vacuuming.

$100.00
AddPressure Wash Touch-up
Post-Construction CleanWhen to schedule: As needed, PO Pressure wash must be completed 1st. A quick and targeted wash to refresh specific areas, perfect for minor touch-ups and maintenance.

$0.00
AddWindows Reclean
Post-Construction CleanWhen to schedule: As needd, oftentimes along with Homeowner touch up cleans. Thoroughly cleaning windows after project completion, which usually involves removing paint splatters, adhesive residue, dust, debris, and other construction remnants from the glass and window frames, essentially giving the windows a deep clean to restore their appearance after the construction phase is completed.
